The NHS in England · The estate
The estate: running down
It would cost £15.9 billion to clear the NHS maintenance backlog, nearly twice as much in real terms as in 2018/19. More than half of it is high or significant risk. The plan's new fund is smaller than the amount the backlog grows each year.
A backlog that grows every year
The backlog rose from £8.2bn in 2018/19 to £15.9bn in 2024/25 in real terms; the part rated high or significant risk from £4.3bn to £9.1bn. About £4.8bn of new backlog arises each year and trusts invest about £3.2bn to clear it, so it grows by more than £1bn a year.
The plan's fund doesn't stop it growing
- The 10 Year Capital Plan's Estates Safety Fund, £6.75bn over 9 years, is about £0.75bn a year: less than the backlog's yearly growth of about £1.6bn.
- On the plan's funding, the backlog reaches about £21bn by 2035/36 in the report's simulation.
- Clearing it by March 2036, and replacing equipment and IT as they wear out, would take about £2.7bn a year more capital: trusts' capital spending rising from about £8bn to £10.7bn a year.
- Equipment is ageing too: in 2024/25 trusts replaced 77% of the plant and machinery that wore out, and 54% of the IT. At those rates the average remaining life of their equipment and IT falls from about 4.4 years to 1.7 by 2035/36.
Your hospital's estate
The ten acute trusts with the largest backlog for their size
| Trust, 2024/25 | Backlog per m² of floor area | Backlog | High or significant risk |
|---|---|---|---|
| Airedale NHS Foundation Trust | £4,093 | £319m | 94% |
| Imperial College Healthcare NHS Trust | £2,986 | £902m | 96% |
| Croydon Health Services NHS Trust | £2,065 | £184m | 97% |
| Whittington Health NHS Trust | £2,038 | £185m | 82% |
| London North West University Healthcare NHS Trust | £2,016 | £463m | 41% |
| Queen Elizabeth Hospital King's Lynn NHS Foundation Trust | £1,907 | £128m | 83% |
| James Paget University Hospitals NHS Foundation Trust | £1,906 | £119m | 87% |
| Homerton Healthcare NHS Foundation Trust | £1,756 | £132m | 83% |
| The Hillingdon Hospitals NHS Foundation Trust | £1,745 | £146m | 91% |
| West Suffolk NHS Foundation Trust | £1,721 | £111m | 78% |
Cash, 2024/25. Backlog per m²: the cost to clear the backlog over the trust's gross internal floor area. High or significant risk: its share of the backlog. Choose any trust above for its own figures.
What this means for the plan
- Maintaining the estate properly costs about £2.7bn a year more capital. On a fixed budget that money comes out of treatment: about 5 points on the 18-week measure by 2035/36, the honest price of stopping the decay.
- The plan's ambitions for digital care and AI sit on equipment and IT that are wearing out faster than they are replaced.
How to read these figures
- The backlog is what trusts estimate it would cost to bring their buildings and engineering up to standard, from NHS England's Estates Returns Information Collection (ERIC). It is the size of the problem, not money spent. PFI and other sites are counted together.
- Risk ratings are the trusts' own: high risk could cause serious injury or failure of a service; significant risk needs spending soon and careful management so that it doesn't become a high risk.
- England's figures cover every NHS trust, in 2024/25 prices (GDP deflator). Trust figures are cash, 2024/25, for 114 of the report's 117 acute trusts with ERIC returns; merged trusts are shown as their current organisation. Ranks run from 1 (highest); the middle acute trust is the median.
- Investment, new backlog, equipment and IT figures, the fund and the projections are from the report (section 4).
What would meet the targets?What is wrong with the plan?
Sources
- NHS England, Estates Returns Information Collection (ERIC); trust accounts (Trust Accounts Consolidation data); DHSC, 10 Year Capital Plan. Simulation: the report's model.